Contractors will use HDD to arc 9 – 12 metres beneath the river bed.
| LOGIN |
Thu, 1 January 2009
The Enbridge oil pipeline being installed in La Salle County, one 42 inch pipeline and one 20 inch pipeline, involves many road, river and rail crossings including the Illinois River crossing.
Share this article on the web:
Categories: HDD
· ISTT No-Dig Awards 2008
Wed, 1 October 2008
· Vermeer brings its best to Brisbane
· New rig for Coe
· Crossing the Athabasca River
· Vermeer Navigator D18x22
· HDD – a Grande idea
· Trenchless ensures cleaner oceans for Guam
Embed this article:
Paste the above HTML code into your website to embed the article.
Article permalink: http://trenchlessinternational.com/news/ road_rail_and_river_crossings/000537/
Do you have something to tell Trenchless International? Submit your news or information here.