.
| LOGIN |
Thu, 1 January 2009
A project in Poland’s capital Warsaw, to relieve the down-town sewer collector and to transport wastewater to the new treatment plant “Czajka,” was constructed with 3.3 km of HOBAS CC-GRP jacking pipes installed by remote controlled microtunnelling at depths of 4.7 – 10.6 metres, including six curves.
Share this article on the web:
Categories: Rehabilitation and Repair
· Indian lake to get a trenchless makeover
Wed, 20 May 2009
· Specialised design considerations for liners in gravity flow pipes
· Lining in Australia’s capital
· Coating shafts - substrate preparation perfected
· Kembla appoints new Southern Division Manager
· Sydney Water wins heritage award
Mon, 29 June 2009
· The state of road gully systems in Germany Part 1
Embed this article:
Paste the above HTML code into your website to embed the article.
Article permalink: http://trenchlessinternational.com/news/ going_round_the_bend/000542/
Do you have something to tell Trenchless International? Submit your news or information here.